NACC


Lightweight Gas Block Production Line (NAAC)

In the production line of light aerated concrete blocks, the raw materials are poured into the molds after being transferred to the central batching and mixing and preparation. The molds, which are placed on special wagons, are then moved to the primary greenhouse on the rails installed in the production hall. After the time required for the initial processing of concrete, the molds are directed to the cutting machines and after the cutting operation, the product is placed in the secondary greenhouse and after the required time, the final product is packed and placed on the pallets. The outside space of the hall is stored.

Lightweight Gas Block Production Line (NAAC)

A production line includes various devices or processes, and the product is produced when these equipments and processes, in addition to proper operation, can follow a predetermined path in coordination with other parts and during the required processes. Therefore, in addition to the equipment, coordination between the equipment is also crucial.

necessary equipment

Secondary greenhouse
Production hall rails
Mold oil sprayer
Cutting machines
Hot water supply sources
Material weighing system
Format
Mold wagons
Electric sieve
Central heating system
Primary greenhouse
Central batching system
Automatic control panel
Conveyor for transporting materials
Cement transport screw
cement silo
Sand depot tank

benefits

economic efficiency
High execution speed
Earthquake Resistant
Fire resistance
light weight
Sound insulation
Insulation
Waterproofing

بدون نظر

Leave a Reply

Your email address will not be published. Required fields are marked *