CLC light block production line


Lightweight Gas Block Production Line (NAAC)

In the production line of light aerated concrete blocks, the raw materials are poured into the molds after being transferred to the central batching and mixing and preparation. The molds, which are placed on special wagons, are then moved to the primary greenhouse on the rails installed in the production hall. After the time required for the initial processing of concrete, the molds are directed to the cutting machines and after the cutting operation, the product is placed in the secondary greenhouse and after the required time, the final product is packed and placed on the pallets. The outside space of the hall is stored.

Equipment required to set up a lightweight concrete block production line by shear method:
Production hall rails
Mold oil sprayer
Cutting machines
Hot water supply sources
Format
Mold wagons
Electric sieve
cement silo
Screw cement
Central batching system
Automatic control panel
Material weighing system
Conveyor for transporting materials
Sand depot tank